ROMAN POT ALIGNMENT + LOSS MAPS AT THE END

Pre-requisites:
1. Modify BLM thresholds: set them from 0.1 to 1 for the list of BLMs that Eva Holzer should provide. This BLM threshold modification can be done by Jorg or Eva. Contact Eva well in advance to get the list and modify the thresholds during the ramp down of the previous fill. Run afterwards the BLM tasks.
 
Special conditions:
1. Use the hyper cycle 6.5TeV_mediumBeta_2015
2. Set the SBF to RESTRICTED and mask everything maskable.
3. When injection of nominal SKIP the task that forces the SBF to FALSE.
4. Use the following injection schema: 2nominals_10pilots_RomanPot_Alignment (it is in the list of Singles) Only the nominals collide in all IPs.
5. After the ramp is finished from then on use the sequence MEDIUMBETA 2015 OPTICS COMMISSIONING 
 
 

You are here